The Client
In 2008, Shanahan Engineering secured through a competitive bid process a project for a HRSG erection (and subsequent BOP repairs) for Alstom Power at Langage Energy Centre, UK.
Shanahan Engineering had previously developed a strong relationship with Alstom by demonstrating its ability to complete projects on time, but this bid was won because of its pricing structure and a willingness to participate in a target cost contract. The Langage project was specifically designed to portray an elegant exterior and therefore significant effort, time and investment was required for the design, procurement and erection of the façade.